GEOTECHNICAL DESIGN FOR PEAK RESORT

We are pleased to announce that we have now completed the current geotechnical design aspects of the S278 highway works for Peak Resort in Derbyshire.  Working with Inspire Design & Development, and Groundsmiths, we have prepared the earthworks design for the new access road and A61 slip road diversion to EC7.  We have also looked at the existing slopes adjacent to the River Drone for good measure, whilst Groundsmiths have looked at the mining risk aspects.